19/10/2026
130m² of workshop floor. All prepped by one person. 👏
This Rombus Fusion V2 project had the footings and grid filled in the same pour, with previously used Rombus grid put back to work along one edge.
Reusing that material reduced how much new grid the owner needed to buy. A practical saving when you’ve got a whole workshop to cover.