08/15/2026
Last week’s “Scorpions On The Trail” Work Summaries
Saturday August 1st - On Saturday 8/1, five Scorpions, Jeff, Christoph, Doug, and newcomers Etamine and Erica brushed and logged the Quaking Aspen trail. Initial progress was slow as the crew lopped its way through a series of Vine Maple thickets. Past the thickets, we found and cut logs including several recently fallen green logs that took some work. We worked until 2:30, cutting our way through another swampy vine maple thicket, at which point we had cleared about 3.5 miles of the four-mile trail. In the last half mile before the junction with the French Pete trail, we found seven logs which will provide a day's work for a future crew. By 4:00, we arrived at the truck we had staged at the Pat Saddle trailhead.
The last three logs, a 30 incher and two 20 inchers, all green, are at 44.05678, -122.07813….Doug
Monday August 3rd - Well, that was an all-day adventure. On Monday August 3rd, six Scorpions formed two teams and went back to French Pete to continue the logout/brushing and to scout what remains to be done. Team 1 planned to do the 10mi through-hike from Pat Saddle down to the lower trailhead and Team 2 would shuttle Team 1 as well as work the upper part of the trail.
The teams went down French Pete together passing where earlier Scorpion teams had already cleared this season and then scouted down further skipping over about 15 logs as we went. Once we hit the lowest point for Team 2, Steve and Jeff turned around to work those 15 logs up the long slog back to their cars. Team #2 was rewarded for their logout and uphill efforts with a flat tire. Whomp whomp. Team 1 of Garrett, Alex, Maryanne and Brian continued on down the trail cutting out logs and messes until about 2:30pm – 3:00pm at which point we switched from work mode to “hike out and scout” mode. After rejoining the already cleared section, we pushed on for the car. While the tread is in remarkably good shape, it was slow going and we got off the trail to the shuttle car just before 7pm.
Great day on a beautiful trail. We managed to work another 1.25mi further down from the upper trailhead and now have an idea of what work remains. There is still about 1.75mi uncleared with 32 logs. Some are cuts and some are movers but nothing that looks overly complicated – just time consuming. Unfortunately, it is the middle of the trail that is uncleared so it is a long commute from either end to the work area. Next time…Brian R.
Tuesday August 4th – A crew of 3 Scorpions started some prep work to access the north side of Hand Lake trail. We spent the day logging out and brushing FR841 so a future Scorpion crew could safely drive up to where it ends a bushwhack to the north TH and Hand Lake. This cuts about 3-4 miles off of the hike.
There were several large logs blocking the road, shrubby growth in the center of the road and lots of encroaching branches of firs narrowing the corridor. A chain saw and a power brusher got a good work out during the day as we worked our way up the 1 plus mile road. At days end the corridor was nice and open and the roadbed was given a fresh crew cut.
Tuesday August 11th - Brian and Garrett returned to Olallie Trail for one last day trip push. We geared up and started the hike from Pat Saddle TH up to the saddle and then beyond just past the old guard station location and continued logging out from where we left off last month. We were back in the green forest, and there ended up being a fair amount of larger logs to cut out. A few were approaching 20" or so. One put up quite a fight with hidden bind and horizontal cracks, making for an "interesting" cutting experience. We finally finished the problem log and enjoyed a victory lunch, then moved on down the trail. We reached our goal of the jct with Park Trail #3530 and then continued just a short distance beyond, finally turning around roughly 1/5 mile past the jct. We made the long slog back to the car enjoying the great views of the mountains on the way down.
Thank you to all for putting so much hard work on both Olallie Trail and Olallie Mountain Trail. Both trails got totally hammered over the winter and nothing came easy with either trail this season. It isn't much of an understatement to say that virtually every foot was a battle. Great job team!! Lets hope that next year is a bit more forgiving!....Garrett
Thursday August 14th – A crew of 12 went to the Waldo Lake area to work on the South Waldo trail in the wilderness section and poke further up the Mt Ray trail to see what it looked like in the burn zone towards High Divide.
We split into 4 teams of 3 each. Two XC-saw teams started at Shadow Bay and hiked about 2-miles to reach the South Waldo trail. We proceeded up (about 1000ft) the South Waldo trail bucking up about 15 logs on the way to the jct with My Ray trail. Two other crews of 3 started from the Mt Ray TH and hiked a little over 2 miles to the jct of South Waldo and Mt Ray. One tread crew of three started working on the South Waldo putting in about a half dozen drainage structures on a severely eroded section of trail. The remaining crew of three continued on up Mt Ray into the Cedar Creek burn zone which starts about .5 miles further. They bucked up logs until they reached the burn boundary and then entered what looked more like a desert than a forest. No logs survived in this extremely intense burn zone. The trail was mostly invisible, and the ground was like talcum powder. They proceeded another half mile into the burn zone searching for the trail using a GPS track and marking the trail location as best they could for future work.
Friday August 15th - On Friday August 14th, new Scorpions John M and Lisa M joined Brian R to make headway on the Hand Lake trail from the northern intersection with Deer Butte. Utilizing the scout and prep work of earlier teams, we were able to drive to within ¼ mi of the trail junction. Kudos to the team that brushed and logged out the spur road - that looked like a LOT of work. In the forest, the workload was light but once in the burn, there were more logs. John and Lisa caught on quickly and were eager to try using the bar or single cuts where ever possible. We stopped for lunch in the shade before starting work on a 21” green log with quite a bit of top and side bind. The early day enthusiasm was temporarily sapped as they got the opportunity to earn their under-bucking merit badge on the argumentative log. It took a bit of time (and a lot of under bucking) but we got through the log and moved on to easier work. We called it a day at the base of the switchbacks about 1.7mi from the Deer Butte/ Hand Lake junction. We had beautiful skies, good air and even a few clouds for cover. Welcome to the newcomers.
We hope to see you on the trail soon.
Next week's projects:
Tuesday August 18th- Eugene to Crest post fire tread restoration and brushing
Sign up link: https://bttr.im/9ha7v
Thursday August 20th - Deer Butte XC Logout
Sign up link: https://bttr.im/ivwdp