06/04/2026
Ok then. As we are wrapping up the frame and bracing portion of this job.
We had to add some substantial extra frame work towards the front. The 8' space from left to right across, originally and just 1" Hallow aluminum tubing. Over the time and rot it had bent downwards. I added a full 2x4 across the span with an aluminum plate gusset , pulled the deflection out and braced up in the center.
Not every job is the same. Always something different needs to be done.
Have a good day. Purple foam insulation is going to be installed now