10/28/2026
📢 PUBLIC NOTICE: Crystal Avenue Detour — Gold Star Bridge Rehabilitation
CTDOT Project Info: Project No. 0094-0261 — Gold Star Memorial Bridge Rehabilitation
New London Police Department | City of New London
🗓️ When
Tuesday, October 27, 2026 through Friday, November 13, 2026
📍 Where
A portion of Crystal Avenue, New London — in the vicinity of State Pier Road
🚧 What to Expect
As part of the ongoing rehabilitation of the Gold Star Memorial Bridge (I-95 NB over the Thames River), the Connecticut Department of Transportation (CTDOT) and its contractor will temporarily close a section of Crystal Avenue to through traffic. A detour plan will be in place for the duration of the closure.
• A portion of Crystal Avenue will be closed to through traffic
(area under the GSB near Lewis St.)
• Local traffic only will be permitted within the closure area
• State Pier Road will remain open throughout the detour
• Posted DETOUR signs will guide motorists along the alternate
route
• Pedestrian access will be maintained (minimum 4-foot path) at
all times
🚗 What Drivers Should Do
• Plan ahead — expect added travel time in the area
• Follow posted detour signage rather than GPS, which may not
reflect the temporary route
• Avoid the area when possible, especially during peak hours
• Residents and businesses along Crystal Ave will continue to
have local access
🚑 Emergency Services
All emergency services, transit providers, and city officials have been notified in advance. Emergency response will not be impacted.
We appreciate the community's patience as this important bridge rehabilitation work moves forward. Please drive safely and watch for workers in the area.