06/12/2026
Following a six-month period without adequate electrical power in the new shop, my electrician successfully restored sufficient power to operate my machinery. I am now creating tool designs to initiate machining for my next three Tunnel Wedge manifolds: 351W, 302W, and BOSS 302 3V.