10/13/2026
1922 Closed Gunwale Old Town HW Restoration
This canoe ended up being yet another quite extensive restoration for this year. The closed gunwale design has a tendency to hold onto water, which lead to the inwales being rotted out in several places and needing complete replacement. The gunwales have a pretty sharp upsweep that required long pre-soaking, steaming, and long wait time clamped in a bending jig before proceeding to actually fitting, finishing, and finally fastening them in place, all while breaking a few expensive pieces in the process(this spruce costs $16 a board foot and takes a 7 hour round trip to go get it). Despite the necessity for this invasive procedure, the bulk of the hull was in very good shape and I did not end up replacing any ribs and only a couple small planks outside of the sheer line planking that had to be replaced as part of the gunwale transplant.
This canoe received:
-new canvas, filler, and paint
-stripped, sanded, revarnished all existing woodwork
-new brass stembands
-new birch seats and thwarts to better match the missing originals
-entirely new spruce inner gunwales and steam bent birch decks. Everything in this area was pre-treated and sealed before reassembly to prevent future rot
-new continuous length spruce gunwale caps, fastened with screws to facilitate future removal for easier maintenance and refinishing
-new brass diamond head thwart bolts to replace the old steel countersunk bolts. This arrangement is stronger than the original method, and makes the bolts easier to remove for maintenance, refinishing, or replacement if needed.
-custom painted nameplate
This canoe has been in this family for over 100 years at this point. With the right care and maintenance, this restoration work should last decades. The hull itself should have no problem surviving another 100 years for future restoration work to renew it again and again.