10/15/2026
We have finished all of the engine blue and partially assembled the components. The front sub frame is now scrubbed clean of grease, primed, painted black, and installed back under the engine/transmission. The body has been moved to a lift so that the chassis jig can be cut off, grease removed, and the underside cleaned up to be rust protected. Once we receive the last of the gaskets and front suspension parts we can install the drivetrain with the subframe. This wat weight can be on the suspension so that gapping of body panels can be done, adjusted, and then finally painted. Restoration is a long road.