10/20/2026
✈️ Project Spotlight: American Airlines | Charlotte, NC
Clear-View, Inc. recently completed a trench drain replacement project near the aircraft wash bay at American Airlines in Charlotte.
The existing 6-inch trench drain had failed, creating drainage issues and a potential safety hazard. Our team excavated the old drain, saw-cut the concrete 10 inches deep, and installed a new heavy-duty trench drain surrounded by 5,000 PSI concrete.
The result? A durable drainage solution rated to support 200,000 pounds—built for the demands of airport operations and heavy equipment.
Need reliable concrete repair or drainage solutions for your commercial facility? Our team is ready to help!
🔗 Read more about this project: https://clear-viewnc.com/projects/american-airlines-trench-drain-replacement-charlotte-nc/