Weโre sharing one of our recent project cases โ a bridge constructed in a lavender field at .park
The project required addressing a number of complex site conditions, including elevation differences, a high groundwater level, and limited access for heavy construction equipment. At the same time, preserving the natural landscape was a key priority
For this project, a screw foundation based on geoscrews was selected as the optimal engineering solution
A total of 124 geoscrews were installed, allowing us to complete the foundation within just 25 working days without extensive excavation or concrete works
This solution made it possible to:
โ adapt the structure to uneven terrain
โ work effectively in high groundwater conditions
โ fully preserve the natural flora of the lavender field
โ execute installation without heavy machinery
โ ensure a stable and durable foundation for the bridge
The foundation was designed in accordance with site geology, load requirements, and the functional purpose of the structure
As a result, the project was successfully delivered in a challenging, hard-to-access location while maintaining both engineering reliability and architectural integrity