HOW IT BUILT… with attention to detail and longevity
Steps in Building Your New Atomic Power Boat
Open Mould Production Process:
1st : preparing the hull mould to receive gel coat
2nd : gel coat for bottom of hull applied to hull mould
3rd : laying up the hull, various matting types in specific order
4th : transom lay-up (2x20mm coosa boards bonded together)
5th : plumbing installation (pre-foaming closed cell type)
6th : fuel tank(s) installation
7th : foaming of bulkhead (underdeck) structure
8th : cutting of foam, prior to glassing underdeck
9th : glassing entire underdeck, this to seal each foamed compartment 360 deg. prior to deck, gunwales and live well (all one mould) being bonded to underdeck
10th : deck product comprising: deck, gunwales, live well and outboard splash/motor well (tip of bow to transom) are all one mould, offering a seamless integration of deck and underdeck
11th : deck bonded, indicating fuel tank(s) void, pre console being fitted
12th : light grey & white 22 surfaces from mould
13th : installation of 25mmx5mm stainless keel strip
14th : installation bow and seat grab rails commences
15th: custom designed trailers, correct steel gauge, braced as per best practice, this to spread the weight correctly ensuring boat and trailer structural integrity all times while beach launching and being towed