29/09/2026
Plant planning starts long before commissioning.
Machine length affects:
Factory layout.
Material movement.
Working space.
Utilities.
Future expansion.
A manufacturing line shouldn't be squeezed into whatever space is available.
The plant should be planned around the production line.