10/11/2014
ok, current status and a few pics of where we are so far...peak arches, front end chassis and Hayburner Steering box rai...
10/11/2014

ok, current status and a few pics of where we are so far...peak arches, front end chassis and Hayburner Steering box raise kit going in

09/11/2014

Loads more photos to upload, it's a project we are on and off with working around customers buses but we'll see if we can the thread going with fresh photos before the work really starts đŸ˜€

Bullet has been bitten and after more hair pulling and swearing we have had to source a donor chassis for the pieces of ...
09/11/2014

Bullet has been bitten and after more hair pulling and swearing we have had to source a donor chassis for the pieces of rare unavailable VW metal we need, we'd rather have original metal than settle for poor repops. Yes all will have to be unpicked. This was originally cut in the 80`s so it goes to good use. rare centre piece and rear inner cuts are a god send, thanks Paul Irving :)

This is what Shares in Autocraft Engineering, Klassicfab and Alan Schofields looks like but a big thank you to them........
09/11/2014

This is what Shares in Autocraft Engineering, Klassicfab and Alan Schofields looks like but a big thank you to them.....oh and WW floors and Klassicfab Nose skin

blasting done(for now) and master cylinder support rail welded in
09/11/2014

blasting done(for now) and master cylinder support rail welded in

Lots of areas inaccessible to address properly so a mobile media blaster is called in to prep the workable area to enabl...
09/11/2014

Lots of areas inaccessible to address properly so a mobile media blaster is called in to prep the workable area to enable proper inspection and preparation

Investigation confirms the worst... both arches gone(inner and outer) and inner and outer lower valance along with A pil...
09/11/2014

Investigation confirms the worst... both arches gone(inner and outer) and inner and outer lower valance along with A pillars. Correct metalworking of these areas means its off with the nose which is a shame as this is pretty straight and largely rust free

starting at the front and underneath, whats left of the floor comes up, braced and left side chassis rail out ready to t...
09/11/2014

starting at the front and underneath, whats left of the floor comes up, braced and left side chassis rail out ready to take new one

engine and transaxle out, beam and floor, doors off glass out...oh and floor. master cylinder brace also now shot and re...
09/11/2014

engine and transaxle out, beam and floor, doors off glass out...oh and floor. master cylinder brace also now shot and replaced with a schofield hand made one

Address

Worcester
WR74HT

Telephone

+447952448353

Website

Alerts

Be the first to know and let us send you an email when Project Georgia, Restoration of a 21 window Samba posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Project Georgia, Restoration of a 21 window Samba:

Shortcuts

Share