10/11/2026
Large delivery of gaskets turned up today, so lots are back in stock along with the Ford 2.9 12v + 24v V6 water pumps.
Been having a big sort out in the workshop the last 10 days, purchased a load of new work benches to mount the machinery on so getting the place tidy and more organised. I was lucky to be given a set of heavy duty cylinder head pressure test plates, so in the process of designing and building a fixed pressure test rig. I`m also in the process of wiring the smaller swing arm grinder up so I have a dedicated machine for refacing flywheels. Until the new crankshaft/flywheel/pulley dynamic balancing machine arrives it will be refacing only, no lightening.
Brake disc grinder is now at the docks ready to load on to the cargo ship so barring any issues with customs it should arrive end of December.
I`m getting quite booked up with jobs already with the run up to December so if you require a cylinder head refreshing this side of Christmas drop me a DM or ring up and get it booked in sooner rather than later to avoid disappointment.