26/08/2026
Hi from the bottom of the ramp at DEM Motorcycles and Motorcycle Tyre Center So today this happened new belt on a 1340 evo softail so primery off, wheel out, swing arm out. New belt in the rebuild withh all the relevant new parts only took 9 hours with a rear brake light switch repair and rear wheel swap then swap back because it didn't fit. But all up and running and been for a test ride. So if you need this doing im sure there is a Harley dealer somewhere that loves this job. Thanks for reading
Dave