24/09/2026
Can we transform this 1988 130 in just TWO WEEKS? 👀
In Part 1 of this restoration project, is now live on our YouTube channel!
we’re taking a 1988 130 with its original 3.5L V8 and stripping it right back to bare metal, ready for a complete transformation ahead of the shooting season.
Preparation is everything on a build like this. Before any paint goes near the truck, there’s a huge amount of stripping, metal preparation and filling to get through. Get the prep wrong and even the best paint finish won’t last.
The plan is to combine a high-end gloss finish with heavy-duty Raptor protection, giving the truck the durability it needs for green lanes and countryside use while still making it look smart enough to stand out when travelling through stately homes and estates.
With only two weeks to complete the project, the pressure is on.
Will we get it finished in time?
Subscribe to our channel and follow the build to find out in Part 2.
🔧 1988 130 restoration
🔥 Original 3.5L V8
🛠️ Full strip-down and bare metal preparation
🎨 High-gloss paint finish
💪 Heavy-duty Raptor protection
🌿 Built for green lanes and countryside use
⏱️ Two-week deadline before shooting season
If you enjoy classic 4x4 restorations, vehicle paintwork, bodywork preparation, off-road builds and complete vehicle transformations, make sure you subscribe and follow the series.
VehicleRestoration CarRestoration RaptorCoating Bodywork CarPainting Paintwork GreenLaning OffRoadBuild RestorationProject ShootingVehicle