2026/10/06
Model Spotlight: DK-PS 19m Catamaran for Island Routes
Some island routes don't need a bigger boat. They need a different kind of boat.
If you move passengers between islands — town pier to resort cay, mainland to a harbour with no bridge — you know the drill. Two small boats, two crews, two fuel bills, and a boarding scramble every time the scheduled run comes in.
That's the gap the DK-PS was designed around. It's a 19m passenger catamaran, and we build it at Qingdao Dookyu Crown Marine Co., Ltd., a yard in Qingdao, Shandong, that turns out aluminum boats, steel vessels and fiberglass hulls for commercial and government operators.
The number that matters most: 50 passengers. Not 50 squeezed in standing — 50 with a deck you can actually load and unload. Under the deck, propulsion is twin diesel engines with fixed-pitch propellers, and the running gear is doubled up: double engines, double paddles, double rudders. In plain terms, trouble on one side doesn't leave you drifting with a full deck of people on board.
Why twin hulls? On a short crossing, boarding time usually costs you more than top speed does. A catamaran gives you a wider platform, steadier footing at the pier, and more usable deck for seating, luggage and a proper boarding gate. Passengers with bags, kids or a bad knee feel that difference in the first thirty seconds.
One honest limit. This is a calm-water design: sheltered channels, bays, lagoon runs, harbour-to-harbour hops. If your route regularly punches through open swell, the DK-PS isn't the right hull, and we'd rather say so now than after the contract is signed.
On the paperwork side, the 19m Passenger Catamaran series is covered by an ECM-issued attestation, certificate no. 0P250716.QDCTN80, valid to 15 July 2030.
Because it's a semi-custom build, seating configuration, deck layout, wheelhouse position, paint and interior style can all be worked out with our team. Minimum order is one vessel, typical lead time runs 30–60 days, and OEM or ODM production is available if you already have drawings or a brand to fit.
So here's a question for the operators out there: on your route, what actually eats the schedule — the boarding, the headcount, or the weather window? That answer usually decides the layout long before we cut the first plate of steel.