09/10/2026
More shop updates... the interior metal is done, the boiler is in, most of the electric outlets are in, some light switches are in, one ceiling fan is in and operational, all three garage doors and openers function, and both coach lights function. I still need to connect the water, install two more ceiling fans, and finish the outlets and switches.