01/23/2026
Photos from a recently completed project at Georgia Power’s Plant Scherer. This work included a multi-span railroad coal unloading facility with car wash, along with tie-ins to existing infrastructure. The unloading area consists of 23 spans and was successfully integrated into ongoing operations.