23/02/2022
ITUNU RESIDENTIAL: SITE AND SERVICE
About ITÙNÚ Residential Site and Service
ITÙNÚ Residential lies in Aiyetoro, Ibeju-Lekki LGA, facing the Lekki-Epe Expressway. It has a topography perfect for residents seeking a tranquil and natural environment.
ITÙNÚ Residential, is in proximity to significant landmarks such as; the Epe Resort and Spa, Epe Fish Market, Craneburg Lagos Yard, and Neander International School.
LOCATION
ITÙNÚ Residential is situated at Aiyetoro, Ibeju-Lekki Local Government Area, facing the Lekki-Epe Expressway, in Lekki Free Zone. Navigation to Itunu is direct, and easily accessible, as it is a straight drive through the Lekki axis.
40 minutes drive to Lekki Phase 1
50 minutes drive to Victoria Island
60 minutes drive to Lagos-Ibadan ExpressWay
FEATURES
GOOD Road network, water, electricity, drainage system, central sewage system, lofthouses, green areas (recreational spaces), a family entertainment center.
LANDMARKS
- Epe Resort and spa
- Alaro city
- Epe Fish Market
- Craneburg Lagos Yard
- Neander International School.
SITE AND SERVICE
ITÙNÚ Residential reflects the evergreen land, in the Lekki Free Zone, along Lekki-Epe expressway. The primary infrastructure, such as; A gated fence, amazing road network, proper drainage system, water supply and more, will be made available by Veritasi Homes.
Loft Houses and simple terraces will be built for holiday get-aways and reservations.
This is a residence carefully developed to provide serenity, recreation and natural appeal to its residents.
PRICE
Price: For 500sqm
Launch Phase - 16M | Newly launched project, Infrastructure is yet to begin.
3 Months - 26M | First phase completion of the road network, drainage and landscaping.
12 Months - 35M | Second phase completion of the road network, drainage and landscaping.
18 Months - 50M | Underground electrification, water system and central sewage system.
24 Months - 60M | Unveiling of the family entertainment center and water park.
Price: For 300sqm
Launch Phase - 11.5M | Newly launched project, Infrastructure is yet to begin.
3 Months - 15.6M | First phase completion of the road network, drainage and landscaping.
12 Months - 21M | Second phase completion of the road network, drainage and landscaping.
18 Months - 30M | Underground electrification, water system and central sewage system.
24 Months - 36M | Unveiling of the family entertainment center and water park.
WHY YOU NEED A PIECE OF ITÙNÚ
• Serene and secured environment
• A land title with Certificate of Occupancy
• Residential plot of land from 300 sqm
• Road network, drainage system, Potable water system and central sewage system
• Underground electrification, family entertainment park, green areas and water park.
For more information and inspection call or chat me up on: +234 7035895274
Or click the link below to chat me up
https://wa.me/message/MASFIEHEWOWZH1