Workersbee EVSE

Call Website Contact the business

Workersbee EVSE Professional EVSE products manufacturer, with UL/TUV/CE certificate.

Including EV Wallbox、Portable EV Charger、EV cable、EV Connector、EV adapter、 EV Charging socket., etc

As the Mid-Autumn Festival approaches, Workersbee prepared thoughtful gifts for our team to share the warmth and joy of ...
16/09/2026

As the Mid-Autumn Festival approaches, Workersbee prepared thoughtful gifts for our team to share the warmth and joy of this special occasion.

Wishing our colleagues, partners, and customers a happy and peaceful Mid-Autumn Festival filled with family, gratitude, and bright moments under the full moon.

A liquid-cooled charging cable relies on a complete circulation loop—not a single cooling tube.Coolant circulates throug...
14/09/2026

A liquid-cooled charging cable relies on a complete circulation loop—not a single cooling tube.

Coolant circulates through separate supply and return paths between the charging cable assembly and the cooling unit. This continuous flow helps transfer heat away from high-current areas and supports more stable thermal performance during high-power DC charging.

The connector, cable, coolant paths, seals, sensors and cooling unit must work together as one system. Effective thermal management depends not only on current capacity, but also on how the complete cooling loop is designed and integrated.

18/08/2026

High-power charging depends on more than current rating. Thermal management, cable handling, and durability all affect charger integration and daily operation.

The Workersbee CCS2 liquid-cooled DC charging cable offers:

• 500A rated current
• 1000V DC
• Up to 500kW under specified system conditions
• 34mm cable diameter for easier handling
• IP55 protection
• Over 10,000 mating cycles
• 5m standard cable length, with customization available

Watch the video for a quick product overview.

If you are evaluating liquid-cooled CCS2 cable assemblies for a charging project, contact Workersbee to discuss your technical requirements.

What should you do when a GB/T DC charging connector remains locked after charging?In this short demonstration, our engi...
14/08/2026

What should you do when a GB/T DC charging connector remains locked after charging?

In this short demonstration, our engineer shows how to locate the manual release hole and disengage the electronic lock using the supplied release tool.

The video also explains what can be used if the original tool is unavailable—and why plastic objects or twigs should be avoided.

It is a small product detail, but an important one for the operation and maintenance of DC charging equipment.

Watch the demonstration:

https://youtube.com/shorts/pLTjeqJ_zGU?feature=share

Can’t remove a GB/T DC charging connector after charging? The elect...

The UK’s public EV charging network is developing in two directions.By the end of June 2026:• The overall network grew 1...
27/07/2026

The UK’s public EV charging network is developing in two directions.

By the end of June 2026:

• The overall network grew 10% year on year
• On-street chargers grew 18%
• Ultra-rapid chargers rated at 150 kW+ grew 37%

The figures reflect different charging needs.

Drivers without private parking need convenient local and overnight charging. Drivers travelling longer distances need faster charging along major routes.

The next phase of charging infrastructure will not be defined by charger count alone, but by whether the right type of charging is available in the right location.

Source: Zapmap, H1 2026 UK EV charging infrastructure statistics

Testing is where product reliability becomes visible.Take a closer look at Workersbee’s laboratory and see how we suppor...
10/07/2026

Testing is where product reliability becomes visible.

Take a closer look at Workersbee’s laboratory and see how we support the quality validation of EV charging connectors, cables, and charging components.

Watch now:
https://www.youtube.com/watch?v=gB5GjYbC52c

Workersbee conducts in-house testing for EV charging products, incl...

Happy Father’s Day!Behind every journey, there is care, strength, and steady support.On this special day, Workersbee sen...
20/06/2026

Happy Father’s Day!

Behind every journey, there is care, strength, and steady support.

On this special day, Workersbee sends warm wishes to all fathers and father figures who guide, protect, and power the road ahead.

May every journey be safe, meaningful, and full of connection.

Happy Dragon Boat Festival! 🐉As dragon boats move forward with rhythm and teamwork, this traditional festival reminds us...
18/06/2026

Happy Dragon Boat Festival! 🐉

As dragon boats move forward with rhythm and teamwork, this traditional festival reminds us of connection, wellness, and shared hopes for the future. 🚣‍♂️

At Workersbee, we celebrate this meaningful day with our best wishes for peace, health, and a greener tomorrow. 🌿

May tradition bring warmth, and may every step forward lead us toward a more sustainable future.

Best wishes from Workersbee. 🍃

Today at Workersbee, we celebrated our June birthday colleagues with cakes, snacks, games, and warm wishes from the team...
16/06/2026

Today at Workersbee, we celebrated our June birthday colleagues with cakes, snacks, games, and warm wishes from the team. 🎂

It was a simple but joyful moment to pause from work, share smiles, and enjoy time together.

Happy birthday to all our June stars. Wishing you health, happiness, and continued growth in the year ahead.

Happy Children’s Day! 🌱Children see the world with curiosity, imagination, and simple joy. A paper plane, a sunny day, a...
01/06/2026

Happy Children’s Day! 🌱

Children see the world with curiosity, imagination, and simple joy. A paper plane, a sunny day, and a small dream can mean everything to them. ✈️

For the next generation, a better future is shaped by the choices we make today.

At Workersbee, we believe cleaner mobility and sustainable development can help create a brighter, greener world for the children of tomorrow. 🌍

Wishing every child a joyful Children’s Day and a future full of possibilities. 🎈

Address

Building K, Phase II Of Plainvim International Industrial Park, 45 Chunxing Road, Zaoqian Subdistrict, SIP-xiangcheng Cooperation Zone, Xinagcheng
Suzhou
215000

Alerts

Be the first to know and let us send you an email when Workersbee EVSE posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Workersbee EVSE:

Shortcuts

Share